After much annoying structural prep work, including using the cool pully I bought for a dollar at a woodworker’s garage sale to eliminate the bow in one of the walls, I got my sleeping and storage lofts done. It’s the first work that will actually be visible when the house is finished, and I had to be meticulous about it.
Now I can start on the roof!